Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic
Oyuki Godfrey

Oyuki Godfrey

WATSAN/WASH Engineer
Mogadishu,BN

Summary

WASH & WATSAN Engineer with ability to lead complete program of works within United Nations Camps in Somalia and government WASH/WATSAN projects in Uganda. Proven abilities in verification of appropriate standard and quantity of materials used in water/sanitation schemes and technology improvement across African-based projects. Skilled in planning, designing, and implementation of water and sanitation service improvements. Ability to develop capacity of sanitation service providers and development agencies, and test new technology on water and sanitation service improvement. Project manager, managing all aspects of project success from inception to completion ensuring strict alignment with scope, exact specifications, and budgetary requirements. Respected leader charged with developing and directing project team to go above and beyond in the delivery of project goals and exceeding client expectations. Expert in establishing working relationships with the United Nations and NGOs to manage water engineering programs. Able to ensure environmental and sustainability, including policy development and product innovation. Effective communicator, with strong interpersonal skills, and the ability to work cohesively with colleagues in both the office and field to support operational objectives.

Overview

6
6
years of professional experience
10
10
years of post-secondary education
3
3
Certifications

Work History

WATSAN Project Manager

I.A.G International L.L.C
Mogadishu, BN
01.2020 - Current

Site Engineer

I.A.G International L.L.C
Mogadishu, BN
07.2019 - 12.2019
  • Deliver technical and analytical expertise to develop and implement WATSAN initiatives in Somalia
  • Consistently monitored machinery by taking measurements and interpreting data to improve water quality
  • Provide storm water drainage solutions by designing and constructing Mogadishu Logistics Base’s drainage solution within Mogadishu UN
  • Camp
  • Build sewerage networks, septic tanks, and soakaways for UN mission camps in Somalia
  • Establish water supply systems, including installation and connection of poly-tanks, PPR pipe networks, surface pumps, reverse osmosis treatment plants, drinking water points, and washing facilities
  • Deploy septic systems and lift stations for United Nations, by using UNOE ablutions, sewerage, and water connections
  • Collaborate with UN, NGO, and client teams to implement mission-critical water and sanitation engineering
  • Formulate Auto CAD plans for all water and sanitation works, securing critical acclaim from clients, including United Nations
  • Constructed multiple sewer line projects across United Nations mission in Somalia six sectors of Mogadishu, Baidoa, Kismayo, Beletweyne, Jowhar and Dhobley
  • Designed and constructed and tested multiple water supply systems (both raw water lines and treated water lines) across six sectors of United Nations mission in Somalia; Mogadishu, Baidoa, Kismayo, Beletweyne, Jowhar and Dhobley
  • Spearheaded WATSAN projects, including design and construction of Reject Waterline from Water
  • Treatment Plant 5 to Indian Ocean in UN Mission Camp in Mogadishu
  • Designed and deployed firefighting hydrant systems in Beletweyne, Somalia UN Sector 4
  • Led construction of concrete structures including reinforced concrete water tank at water plant 1 in Mogadishu, construction of Baidoa sector 3 Helipad and it’s storm water drainage works, and construction of 1No reinforced concrete helipad in Mogadishu
  • Installed Reverse Osmosis Water Treatment Plant for drinking water treatment in Ghana Formation Police Unit within UN Mission Camp in Baidoa, Somalia
  • Proposed, designed, and implemented projects worth $22M across six sectors of United Nations Support mission in Somalia
  • (Mogadishu, Baidoa, Kismayo, Beletweyne, Jowhar and Dhobley)
  • Directed projects worth $4M in Mogadishu, Baidoa and Beletweyne areas
  • Designed and constructed 2km long storm water pipeline from Mogadishu Logistics Base to Indian Ocean
  • Installed and tested four standalone septic systems, designed and constructed 19 septic tanks and 19 soak away pits in Baidoa, Mogadishu, Kismayo, Dhobley, Jowhar and Beletweyne.

WASH Engineer

Ecosan Consulting Limited
Kampala-Uganda, Central
10.2018 - 06.2019
  • Water, Sanitation & Hygiene (, Managed operations and performance of WASH infrastructure
  • Conducted technical assessments, data analysis, updates to WASH infrastructure, and engineering inspections for certification
  • Performed feasibility study and designed faecal sludge treatment plans for Eastern and Northern Uganda
  • Created Auto-CAD structural and technical drawings for Mubaale Water Supply & Sanitation Project
  • Led and designed WATSAN contracts, including site layout plans, works profiles, site leveling checks, and site works checks for Buvuma District
  • Produced professional layouts and profiles for water supply and sanitation works projects
  • Developed work packages for field activities on behalf of senior water engineers
  • Delivered effective guidance to on-site and off-site project teams
  • Maintained water systems including Wells, manual and power pumps, connections, and access points
  • Established solar (PV) power system designs for operation and maintenance of power submersible pumps
  • Oversaw solar-powered pumping systems, including design- development and maintenance for rural and developing regions
  • Carried out faecal sludge characterization in treatment plans for Lubigi, Bugolobi, Kyotera, and Kitigum, with resulting recommendations, securing multi-billion valued projects with Ministry of Water & Environment
  • Directed construction and installation of water treatment structures, sanitation, and hygiene facilities like house hold latrines in Amuru district, VIP latrine for Pabbo primary school in Amuru district
  • Carried out characterization works of Fae-cal sludge across country’s faecal sludge treatment plants, securing contracts worth $4B Uganda shillings from ministry of water and Environment for construction of Kitigum faecal sludge treatment plant and Kyotera faecal sludge treatment plant
  • Organized bidding documents, securing of $2B Uganda shillings contract for construction of Mubaale Water Supply & Sanitation Project in Buvuma district.

Draftsman

Geostatic Surveys & Engineering Consultants Limited
Tororo - Uganda, Eastern
08.2017 - 09.2018
  • Collaborated with consultants to produced rough sketches, detailed plans, and fully rendered products to specifications
  • Oversaw materials calculations and weight limitations
  • Produced accurate surveys of existing land and property by using
  • Total Station, RTK, and Dumpy Level
  • Utilized Auto-CAD to produced 2D and 3D plans
  • Produced technical drawings to specifications and calculations, and quantified works for various drawings
  • Organized profiles from survey data by utilizing Auto-CAD Civil 3D, including profiles, elevations, and models
  • Evaluated and redrafted plans in accordance with
  • Engineer change requests
  • Managed to conduct $200K leveling works for very complicated 160,000 square meters of land for construction of Oil refinery at Electro-max, Tororo – Uganda
  • Produced site layout plans, survey profiles, Benchmarks and general site detailing for site at $100K
  • Conducted land surveys, production of detailed drawings for construction of culverts and local bridges amounting to at least $1.3M.

Student Engineer (Watsan Engineer)

Ministry Of Water And Environment
Kampala - Uganda, Central
01.2016 - 07.2017
  • Ministry of Water & Environment Uganda, Placements, & 2017, Uganda
  • Facilitated construction of Pabbo Water Supply and Sanitation Facilities within three-month placement.
  • Established strong working relationship with the project contractor and project implementation teams which increased productivity in all sites.
  • Performed Engineering roles like supervision, preparation of as built drawings for Bududa-Nabweya Gravity Flow Scheme in Eastern Uganda in three- month placement.

Education

Bachelor of Science - Water Resources Engineering

Busitema University
Tororo - Uganda
08.2014 - 10.2018

Some College (No Degree) -

St Peter’s College Tororo
Tororo - Uganda
02.2012 - 11.2013

Some College (No Degree) - High School Certificate

St Peter’s College
Tororo - Uganda
02.2008 - 11.2011

Skills

Strategic Planning & Analysisundefined

Certification

Project Monitoring & Evaluation (PM&E), The YIELD, 2021

Timeline

WATSAN Project Manager

I.A.G International L.L.C
01.2020 - Current

Site Engineer

I.A.G International L.L.C
07.2019 - 12.2019

WASH Engineer

Ecosan Consulting Limited
10.2018 - 06.2019

Draftsman

Geostatic Surveys & Engineering Consultants Limited
08.2017 - 09.2018

Student Engineer (Watsan Engineer)

Ministry Of Water And Environment
01.2016 - 07.2017

Bachelor of Science - Water Resources Engineering

Busitema University
08.2014 - 10.2018

Some College (No Degree) -

St Peter’s College Tororo
02.2012 - 11.2013

Some College (No Degree) - High School Certificate

St Peter’s College
02.2008 - 11.2011
Oyuki GodfreyWATSAN/WASH Engineer